Home / Solutions / Urban Waterlogging & Pipe Network

Solution 02

Urban Waterlogging & Pipe Network

Level and pressure transmitters report road ponding and buried pipe pressure as it develops. Alarms reach the municipal screen, and gates at rainwater wells can open sooner.

Water LevelPipe PressurepHORPDissolved Oxygen

Overview

A city drainage programme watches three things together: storm water on the carriageway, the level inside the wells, and the pressure in the buried mains that carry the flow away.

Level and pressure readings are analysed as they arrive, and the same controller drives the alarm equipment, relays, solenoid valves and pumps and opens the rainwater well gates. Pipeline valve position is checked against each line’s own pressure band, so the network and the road surface are managed from one point list.

Challenges

What the site has to get past before the readings are worth anything.

Ponding found late

Rainfall concentrates in a few road segments, and by the time a crew sees standing water, traffic is already affected.

Blind pipe network

Buried level and pressure data rarely reach one place, so operators cannot tell which segment is surcharged.

Manual well opening

Opening a rainwater well depends on someone travelling to the location and deciding on the spot.

System Architecture

Three layers: what is measured, how it travels, and where the rules and alarms live.

Measured points

WE-T160 — Road ponding levelWE-T161 — Well levelWE-T100 — Pipe pressureWE-T103 — Differential pressurepH transmitter — Water quality

Network and gateway

WE-X280 — LoRa to 4GWE-X240 — Valve control

Platform and reporting

WES device management platform — Alerts and dashboards

Reference topology

FIELDWE-T160Road ponding levelWE-T161Well levelWE-T100Pipe pressureWE-T103Differential pressurepH transmitterWater qualityEDGEWE-X280LoRa to 4GWE-X240Valve controlPLATFORMWES device management platformAlerts and dashboards

Sensing points are shown by quantity. The models listed below are the ones published on this site; ranges, mounting and probe type are confirmed per project.

Recommended Products

Typical configuration for this deployment. Every model here is published on this site.

Key Benefits

80%

Faster warning

Warning speed increased by 80 percent compared with the previous manual reporting routine.

Earlier gate action

Rainwater well valves can be opened before standing water spreads across the carriageway.

One network view

Road ponding and buried pipe pressure arrive in the same dashboard.